The Pink Line is the first operational line of the Jaipur Metro, running from Mansarovar to Badi Chaupar. It covers a distance of approximately 11.4 kilometers through the heart of Jaipur city.
The line was constructed in two phases. Phase 1A from Mansarovar to Chandpole was inaugurated on June 3, 2015, while Phase 1B from Chandpole to Badi Chaupar was opened on September 23, 2020.
The Pink Line connects several important landmarks and commercial areas of Jaipur, including the Walled City, Railway Station, and residential areas like Mansarovar and Shyam Nagar.
Key Features
- •Length: 11.4 kilometers
- •Stations: 11
- •Status: Fully Operational
- •Interchange: Sindhi Camp (with Orange Line)
- •Frequency: 4-10 minutes during peak hours
- •Operating Hours: 6:00 AM to 10:00 PM
The Orange Line will connect Sitapura Industrial Area to Ambabari, enhancing connectivity across the city.
View Orange LineTerminal Stations
Operating Hours
Frequency
Peak hours: 4-6 minutes
Off-peak: 8-10 minutes
Fare
₹10 (up to 2 km)
₹15 (2-5 km)
₹20 (5-8 km)
₹25 (>8 km)
Stations on Pink Line
Be aware of your surroundings
Stay alert and keep an eye on your belongings at all times.
Check the last train timings
Plan your return journey to avoid being stranded.
Use women's coach during peak hours
The first coach is reserved for women during peak hours.
Know your exit gate
Identify the correct exit gate for your destination.
Keep emergency contacts handy
Save Metro helpline: 1800-180-6797 in your phone.
Report suspicious activities
Inform metro staff or security personnel if you notice anything unusual.